SK310 B15 Development Project - Gas Dehydration & Glycol Regeneration
Client: Sapura Kencana Energy Sarawak Inc. (NewField)
End user: Petronas Carigali Sdn Bhd
Location: Malaysia
Scope: Design and supply of 116 MMSCFD gas dehydration system with contactor tower operating at 111.4 barg @ 47°C with TEG recirculation rate of 12.3 USGPM and 1x 230 kW electric heater.