SK310 B15 Development Project - Gas Dehydration & Glycol Regeneration

Client: Sapura Kencana Energy Sarawak Inc. (NewField)

End user: Petronas Carigali Sdn Bhd

Location: Malaysia

Scope: Design and supply of 116 MMSCFD gas dehydration system with contactor tower operating at 111.4 barg @ 47°C with TEG recirculation rate of 12.3 USGPM and 1x 230 kW electric heater.

Project period: 03/2016 – 02/2017