BOKOR CPP - Gas Dehydration & TEG Regeneration

Client: Malaysia Marine & Heavy Engineering (MMHE)

End user: Petronas Carigali Sdn Bhd

Location: Malaysia

Scope: Design and supply of 1x 20 MMSCFD gas dehydration system with contactor tower operating at 61.4 barg @ 46.5°C with TEG recirculation rate of 1.0 m³/hr and 1x 85 kW electric heater.

Project period: 01/2018 – 01/2019

BOKOR CPP Gas Dehydration & TEG Regeneration Package